| Bathroom
1 |
| Before
|
|
After
|
 |
|
Maximizing
available space
|
The
best use of available space was used in this long, rectangular
bathroom, which had previously been sub-divided with
a separate, partitioned toilet.
H & L removed the walls to open up the space, which
included the installation of the integrated shower unit
shown in the photo. Splasback areas were tiled throughout,
as was the floor area. |
|
|
Click
on photos to enlarge
|
|
|
|
Bathroom
2
|
| Before |
|
After
|
 |
|
Breathing
new life into a tired bathroom
|
| This
rather tired bathroom was given a new lease of life,
which required the repositioning of the bath and sink
units, retiling of splashback areas and complete redecoration
to the client's specification. |
|
|
|
Click
on photos to enlarge
|
|
|
Bathroom
3
|
| Before |
|
After
|
 |
|
A
new lease of life
|
|
Similar
in many respects to 'Example 2' this bathroom was
looking a bit run down and was given a new lease of
life.
Moving
the bath maximized the available space and provided
a lighter, contemporary feel.
|
|
 |
|
Click
on photos to enlarge
|
|
|